I guess it’s been about 3 weeks since my last update. My apologies to those that are continuing to follow… and my thanks.
I had to do some traveling for work, but now I’m back to my regular schedule. On the few days I was home, I did manage to get some more work done on The Boss.
Last update, we installed all the trunk metal, the dropped trunk floor and the rear cockpit bulkhead. Now I’ve cut an access hole in that bulkhead and installed a secondary bulkhead as part of a kit by Breeze. The idea is that since my heater will take up all the space behind the passenger side of the dash, I need a compartment of sorts to store things. This kit creates a compartment just behind the seats. The original design is just an open access hole, but I will be making and installing a lockable door on it.
Finished trunk:
Speaking of the heater, I got the holes cut for that and it is installed on the firewall.
I installed some more Thermo-Tec; the stuff that’s giving me heat and sound insulation.. Also installed the drivers footbox inner wall, leaving the top and outer wall off for now. I still have a lot of work to do in there.
Took my wheels and tires to Absolute Style & Sound in Pasadena, MD for mounting and balancing. They use pneumatic mounting equipment that never touches the face of the wheel and 3D imaging with lasers to do balancing. Got all 4 done and out the door in an afternoon for $125. Not too shabby.
So all 4 wheels and tires are now installed. I just had to roll it out on it’s own feet and let The Boss feel the sunshine. It’s a roller!